Wärtsilä Nacos Platinum bridge systems selected for two new mega yachts

State-of-the-art navigation consoles are included in the complete bridge system

The technology group Wärtsilä has been contracted to supply its Nacos Platinum integrated bridge system for two new mega yachts; one an 85 metre long vessel and the other 91 metres long, being built in Greece. In addition to the systems, Wärtsilä will also provide the project management, engineering, pre-wiring of the consoles and system commissioning services, thus delivering a complete solution. The orders with Wärtsilä were booked in March and July 2017.

The new and advanced bridge console concept for these vessels includes an integrated navigation system (INS) with compass and latest technology navigation sensors, and an integrated automation system with power management functionality. A state-of-the-art propulsion control system and a radio communication system are also included. The overall bridge design has been customised according to the specific requirements for these yachts.

”The Nacos Platinum integrated system is based on the very latest technologies and is in accordance with known and anticipated rules and regulations. Furthermore the system is supported throughout the entire lifecycle to ensure long-term usability and to provide real customer value. Throughout these project negotiations we have worked closely with our local sales and service partner, Environmental Protection Engineering located in Piraeus, and their cooperation has been much appreciated,” says Maik Stoevhase, Director, Automation, Navigation and Control & Integrated Systems, Wärtsilä Marine Solutions.

The modular bridge concept hosts Multipilot multi-functional work stations for indicating the network radars, the electronic chart display and information system (ECDIS), conning, and the integrated automation on the main console. On both bridge wing stations, Datapilot screens will be installed. The enhanced software features of the Nacos Platinum system are designed to promote vessel safety, especially when sailing in unfamiliar waters.

A large 46 inch ECDIS work station will be installed in an adjacent ship office for navigational voyage planning and crew briefing purposes. The system will be connected to the Nacos digital data network enabling planned routing to be accessible from the bridge work stations via an integrated Trackpilot system.

Wärtsilä’s extensive offering for the luxury yacht market, including the Nacos Platinum system, can be seen at stand QS 88 at the Monaco Yacht Show, being held from September 27 to 30.  

Lisää aiheesta Meriteollisuus

Wärtsilä makes Viking Princess the world’s first offshore vessel with a hybrid energy storage solution replacing a traditional generator

13.10.2017

Uuden Mein Schiff 2 -aluksen köli laskettiin Meyer Turun telakalla

05.10.2017

Uusi Mein Schiff 1 laskettiin vesille Meyer Turun telakalla

02.10.2017

Vard kaappaa kaapelialusten suunnittelun markkinoita

27.09.2017

Ranska ja Italia pääsemässä telakkasopuun ilman puolustusvälineyhtiöitä

26.09.2017

Ranskan ja Italian telakkakaavailuihin voi liittyä sotilaallista yhteistyötä

20.09.2017

CMA CGM:n pomo: Uudet megalaivat tilataan Kiinan telakoilta

20.09.2017

MEDIATIEDOT
  • Alan yritykset
  • Meriliikenne
  • Meriteollisuus
  • News
  • Nimitykset
  • Satamat
  • Tapahtumat
  • Turvallisuus
  • Tutkimus ja koulutus
  • Varustamot
  • Ympäristö